Changxin

From your sketch to finished patches.

Design help, fast samples and production in our own factory in Huizhou, with 3 production lines and 50+ people.

Workers at the hot presses in the Changxin factory

Development and sampling

You see it before we make it.

  1. 01

    Send your idea

    A logo file, a sketch or a photo is enough. Tell us the size, colours and what it goes on.

  2. 02

    Free design sketch

    Our designers turn your idea into a sketch, then a detailed size drawing that you confirm before anything is made.

  3. 03

    Sample

    Leather 5 to 7 days, TPU, silicone and PVC 6 to 8 days, metal 12 to 15 days. If you order a sample first, the fee is deducted from your bulk order.

  4. 04

    Production and delivery

    Production starts once you approve the sample, then we ship by express to your door.

Production

Fast, even on small orders.

Minimum order
50 pcs
Pieces a month, maximum
900,000
Factory floor
1,800 m²
Production lines
3
  • 10Hot presses
  • 5High-frequency machines
  • 6Cutting machines
  • 2Leather splitting machines

Production time

Standard leather patches, after the sample is approved.

50 to 500 pieces6 days
500 to 3,000 pieces8 days
3,000 to 5,000 pieces10 days
5,000 to 10,000 pieces12 days

Other products

ProductSampleProduction
TPU, silicone and PVC6 to 8 days7 to 10 days
Metal badges12 to 15 days10 to 15 days

Over 10,000 pieces, or designs that combine several processes, are quoted separately.

Materials

The right material for the product.

See all products →
Brown leather patches

Leather

  • PU leather (OEKO-TEX® Class I)
  • Genuine leather
  • Recycled leather
  • Microfiber
Green PVC patches

Rubber and plastics

  • TPU
  • Silicone
  • PVC
Enamel zinc alloy pin badges

Metal

  • Zinc alloy
  • Tinplate
  • Metal plates and rivets
Embroidered sunflower patches

Textile

  • Embroidery thread
  • Woven labels
  • Paper, leather and linen tags

Backing and attachment

  • Sew-on
  • Iron-on / heat press
  • Self-adhesive
  • Hook and loop
  • Plain backing
  • Pin backing
  • Magnetic backing

Shipping

To your door in about a week.

By DHL, FedEx or UPS, usually 6 to 8 business days. To the US and Australia we can ship duties paid (DDP). To most of Europe we ship DAP, so duties and taxes are paid on delivery.

Payment

Pay the way that suits you.

By bank transfer, credit card or PayPal.

Get a quote

Tell us about your patch.

Send your idea and quantity. We reply in English, usually within an hour during China business hours.

Minimum order 50 pieces. Free artwork mockup and price quotation with every enquiry.

Visiting Guangdong? You are welcome to see the factory.Arrange a visit

Your enquiry

Fields marked * are needed. Everything else helps us quote faster.

WhatsApp